Saturday, March 31, 2007

Lowest Level of the House is Framed

On 4 March 2007, my Dad and I took some pictures of our house under construction.

The lowest floor is framed out.


I'm holding a nail as I stand on the sub-floor of the middle level.


At the bottom level, rough plumbing and electrical were done and the gas lines were installed. Rebar was set for pouring of the concrete floor.


I'm not even sure what I'm holding while I stand where my bedroom will be.


Kids, don't try this at home. I'm walking the gangplank above the lowest floor of the house.